SB 1393 Electric utilities; community solar pilot programs.
Frank W. Wagner | all patrons    ...    notes
| add to my profiles

Summary as passed: (all summaries)

Electric utilities; community solar pilot programs. Requires Dominion Virginia Power and Appalachian Power to conduct a community solar pilot program for retail customers. A pilot program will authorize the participating utility to sell electric power to subscribing customers under a voluntary companion rate schedule, and the utility will generate or purchase the electric power from eligible generation facilities selected for inclusion in the pilot program. An eligible generation facility is an electrical generation facility that (i) exclusively uses energy derived from sunlight; (ii) is placed in service on or after July 1, 2017; (iii) is not constructed by an investor-owned utility but is acquired by an investor-owned utility through an asset purchase agreement or is subject to a power purchase agreement under which the utility purchases the facility's output from a third party; and (iv) has a generating capacity not exceeding two megawatts, subject to an exception. Pilot programs will have a three-year duration unless renewed or made permanent by appropriate legislation. The measure requires an investor-owned utility to select eligible generating facilities for dedication to its pilot program through a request for proposal (RFP) process. The minimum generating capacity of the eligible generating facilities in Appalachian Power's pilot program is 0.5 MW and in Dominion's pilot program is 10 MW. The maximum generating capacity of the eligible generating facilities in Appalachian Power's pilot program is 10 MW and in Dominion's pilot program is 40 MW. The measure establishes a procedure through which an investor-owned utility may increase the generating capacity of facilities in its pilot program above the amount most recently approved by the State Corporation Commission. The measure provides that an investor-owned utility may recover pilot program costs that are not recovered through the voluntary companion rate schedule through variable-output contracts with participating third parties. A subscribing customer's usage above the amount subscribed for the voluntary companion rate schedule shall be billed under the customer's applicable standard rate. The measure authorizes a utility consumer services cooperative to conduct a pilot program and gives the cooperative flexibility in designing its program and voluntary companion rate schedule. The measure declares that the participation of retail customers in a pilot program is in the public interest and that the voluntary companion rate schedules approved are necessary in order to acquire information that is in furtherance of the public interest. The measure requires the Commission to approve the recovery of pilot program costs that it deems to be reasonable and prudent, the pilot program design, the voluntary companion rate schedule, and the portfolio of participating generating facilities. Commission review or approval is not required for individual participating generating facilities, agreements, sites, or RFPs. The measure provides that an approved voluntary companion rate schedule shall not be considered a tariff for electric energy provided 100 percent from renewable energy. An enactment clause directs investor-owned utilities, prior to submitting a proposal for a pilot program, to examine, in cooperation with representatives of relevant governmental, nonprofit, and for-profit entities, options to facilitate the subscribing by low-income customers to the utility's pilot program. Another enactment clause requires participating utilities to disclose to subscribing customers the cost difference between the voluntary companion rate schedule and rate the customer would pay if it was not a subscriber.

Full text:
01/11/17  Senate: Prefiled and ordered printed; offered 01/11/17 17102602D  pdf | impact statement
01/30/17  Senate: Committee substitute printed 17104340D-S1  pdf | impact statement
03/07/17  Senate: Bill text as passed Senate and House (SB1393ER)  pdf | impact statement
03/16/17  Governor: Acts of Assembly Chapter text (CHAP0580)  pdf

Amendments:
House amendments
House amendments engrossed

Status:
01/11/17  Senate: Prefiled and ordered printed; offered 01/11/17 17102602D
01/11/17  Senate: Referred to Committee on Commerce and Labor
01/18/17  Senate: Assigned C&L sub: Renewable Energy
01/30/17  Senate: Reported from Commerce and Labor with substitute (14-Y 0-N 1-A)
01/30/17  Senate: Committee substitute printed 17104340D-S1
01/31/17  Senate: Incorporates SB1208 (Wexton)
02/01/17  Senate: Constitutional reading dispensed (40-Y 0-N)
02/02/17  Senate: Read second time
02/02/17  Senate: Reading of substitute waived
02/02/17  Senate: Committee substitute agreed to 17104340D-S1
02/02/17  Senate: Engrossed by Senate - committee substitute SB1393S1
02/03/17  Senate: Read third time and passed Senate (39-Y 0-N 1-A)
02/08/17  House: Placed on Calendar
02/08/17  House: Read first time
02/08/17  House: Referred to Committee on Commerce and Labor
02/16/17  House: Reported from Commerce and Labor with amendment (21-Y 0-N)
02/20/17  House: Read second time
02/21/17  House: Read third time
02/21/17  House: Committee amendment agreed to
02/21/17  House: Engrossed by House as amended
02/21/17  House: Passed House with amendment (91-Y 2-N 2-A)
02/21/17  House: VOTE: PASSAGE (91-Y 2-N 2-A)
02/22/17  Senate: House amendment agreed to by Senate (39-Y 0-N 1-A)
03/07/17  Senate: Enrolled
03/07/17  Senate: Bill text as passed Senate and House (SB1393ER)
03/07/17  House: Signed by Speaker
03/10/17  Senate: Signed by President
03/13/17  Senate: Enrolled Bill Communicated to Governor on 3/13/17
03/13/17  Governor: Governor's Action Deadline Midnight, March 27, 2017
03/16/17  Governor: Approved by Governor-Chapter 580 (effective 7/1/17)
03/16/17  Governor: Acts of Assembly Chapter text (CHAP0580)